Basement floor almost done
We are doing a structured flooring in the basement. We poured piles when we
did the foundation, then we put 6 inch cardboard void form, then thin plywood for walking on and then 5/8 rebar every foot in a grid pattern. This will stop the basement from heaving. The concrete then goes on next, which will be on tuesday.
did the foundation, then we put 6 inch cardboard void form, then thin plywood for walking on and then 5/8 rebar every foot in a grid pattern. This will stop the basement from heaving. The concrete then goes on next, which will be on tuesday.