Tuesday, April 24, 2007
Previous Posts
- The drywall is up
- Messy front yard
- Basement is coming along very well.
- Fixing some trades screw-ups
- Basement floor almost done
- Deciding on exterior light position
- Cat 6 and Coax are almost done
- Trenching in for Sewer pipe
- Two-Way trenched in again
- Tim the Tin Banger has most of the second floor done
0 Comments:
Post a Comment
<< Home